--- OBSOLETE: outdated by jacks.txt 7/14/1998 From: "Rued, Jenine" To: "'Pythagoras Watson'" Subject: RE: New OCNL Wiring Work Order Date: Fri, 19 Jun 1998 09:39:12 -0700 Thank you for your service request. Work order #8-2085 has been opened. > There is a CAF for new OCNL network wiring. This is its accompaning > work order. The following needs to be changed and is in order of > highest to lowest priority. An accompaning graphic is available at: > http://www.ecst.csuchico.edu/~py/OCNL-network/ > > 1) 2nd Floor Wiring Closet > ----------------------- > Install Cisco 3200 hub (needs up to 10 patch panel ports) > Install four Cisco 1924 hubs (needs up to 104 patch panel ports) > > 2) OCNL 251 > -------- > West wall (26 jacks): > From: Jacks P1-P6, 256-257, Q1-Q6, R1-R6, S1-S6 > To: New hubs in 2nd floor wiring closet > > 3) OCNL 127 > -------- > South wall (19 jacks): > From: Jacks B1-B6, C1-C6, D1-D6, 150 > To: New hubs in 2nd floor wiring closet > > 4) OCNL 241 / OCNL 131 > ------------------- > East wall of OCNL 131 (1 jack): > Swing jack 1020 to jack D1 on South wall of OCNL 241 > (the other end will still terminate in OCNL 255 > patch panel port 3#24) > > East wall of OCNL 131 (1 jack): > Clean up (pull both ends) of jack 1021 > > South wall of OCNL 241 (1 jack): > Clean up (pull both ends) of jack 2000 > (the other end currently terminates in OCNL 255 > patch panel port 3#14 which will be changing (see below)) > > 5) OCNL 255 > -------- > Patch panel 3 (3 jacks): > From: Ports 14-16 > To: New hubs in 2nd floor wiring closet > > Patch panel 4 (26 jacks) (from OCNL 133): > From: Ports 1-8, 11-18, 21-28, 31-32 > To: New hubs in 2nd floor wiring closet > (Pull these ports back in to the 2nd floor wiring closet to connect > to new hubs. In other words, these connections from jacks in > OCNL 133 are now going to go directly to the hubs. The remaining > ports on patch panel 4 should be compressed down in the following > manner: > > Old New Old New Old New Old New Old New > --- --- --- --- --- --- --- --- --- --- > 9 1 10 2 19 3 20 4 29 5 > 30 6 33 7 34 8 35 9 36 10 > 37 11 38 12 39 13 40 14 > ) > > Patch panel 4 (15 jacks): > From: Ports 25-39 > To: New hubs in 2nd floor wiring closet > > Patch panel 5 (4 jacks): > From: Ports 7-10 > To: New hubs in 2nd floor wiring closet > > 6) OCNL 436 > -------- > North wall (2 jacks): > Swing jack 4042 to Student .2 MMAC (line 15) > Swing jack 4043 to new hubs in 2nd floor wiring closet > > 7) OCNL 233 > -------- > North wall (1 jack): > Swing jack 2033 to new hubs in 2nd floor wiring closet > > 8) OCNL 211 > -------- > North-west wall (1 jack): > Swing jack 2110 to new hubs in 2nd floor wiring closet