Spread Spectrum Radio Tests
These two pictures show deployment of the "Tower of Ian" at Charlie
Urbanowicz's home. We connected him to the campus LAN via a Cylink 512K
wireless Ethernet bridge. The tower was fully set-up in three hours and
the LAN connection was complete and operational in five hours (total
time). The tower gave us 55 feet of height for the semi-parabolic antenna
so we could shoot over the trees in the area. The test lasted for four
months and was very sucessful, we even ran a five location Mbone session
for two weeks over the link.
This is a picture of the tower deployed at the University Farm. We used
both Cylink's 512K radio and Western Multiplex's Lynx Classic full T1
radio. Both systems operate in the 2.4 GHz ISM band and are not required
to be licensed by the FCC.