Design Expert System Builder - Node Descriptions

Task

(The icon represents push pin)

Description

Task represents the sequence of steps that are organized in a meaningful way to carry out a given task.

Right Mouse (Meta Key) Menu Options

Rename - Present a dialog to the user in which the caption of this node can be changed.

Add Item to List - Add either a Assignment, IfThenElse, or Constraint step to the end of this list.

Insert Item Before - Add another plan item (Task, Specialist,Constraint) before this Task in a PlanItemList.

Add Item After - Add another plan item after this Task in a PlanItemList

Remove This Item - Remove this item from the list it is in.

Child Nodes

Assignment step (multiple)

If Then Else step (multiple)

Constraint step (multiple)

Parents

PlanItemList

If Then Else - Within and if then else step, one task is executed if the logical operation returns true, and another task is executed if the logical operation returns false.

Expert System Object Generated

Task.class